top of page

Thu, Jun 06

|

Dave and Busters Irvine Spectrum

OC EWRI Presents El Toro Regional Reservoir Floating Cover & Liner Replacement

Registration is closed
See other events
OC EWRI Presents El Toro Regional Reservoir Floating Cover & Liner Replacement
OC EWRI Presents El Toro Regional Reservoir Floating Cover & Liner Replacement

Time & Location

Jun 06, 2024, 10:30 AM – 1:00 PM

Dave and Busters Irvine Spectrum, 661 Spectrum Center Dr, Irvine, CA 92618, USA

About the event

Topic: El Toro Regional Reservoir Floating Cover & Liner Replacement

Speaker: Hannah Ford, Director of Engineering, El Toro Water District

Hannah Ford is the Director of Engineering for El Toro Water District, where she leads her team in executing capital improvement projects that ensure safe and reliable water, wastewater, and recycled water services for over 50,000 customers. Prior to working for the District, Hannah served as a technical design consultant at Carollo Engineers, Inc. and Brown and Caldwell. She received her Bachelor’s degrees in Civil Engineering and French at Loyola Marymount University and Master’s in Environmental Engineering at UC Berkeley.

Synopsis:

The El Toro Regional Reservoir, known as the R-6 Reservoir, provides 275 million gallons of potable water storage. El Toro Water District (ETWD) owns and operates the reservoir; Santa Margarita Water District and Moulton Niguel Water District share capacity of the reservoir for emergency use. The reservoir was originally built in 1964 and was expanded in 2001 to meet daily peak demands and provide seasonal and emergency water storage to our South Orange County communities.

Originally installed 20 years ago, the reservoir’s previous liner and cover were made of reinforced polypropylene and reached the end of their expected useful life. ETWD installed a new cover and liner to keep the reservoir in pristine condition and preserve our Region’s water reliability. The new liner and cover is chlorosulfonated polyethylene (CSPE), a material that will lengthen the anticipated life to 30 years. The liner and cover span approximately 1,200,000 square feet each.

Construction took place over the course of approximately one year from August 2022 to October 2023. Heavy rain and construction traffic damaged the perimeter road, which required ETWD to hire an additional contractor to repair the existing asphalt following cover and liner replacement. Total project cost was approximately $26 million.

Time: Lunch @ 11:50 am; Program ends @ 1:00 pm

Location: Dave and Busters' at Irvine Spectrum, 661 Spectrum Center Drive, Irvine, CA (949) 727-0555

Cost: $45 at the door, $40 advanced payment by mail or credit card, Students $15 at the door with school ID

Mail checks payable "ASCE HHTG" to:

Jenny Robinet, EWRI Chair

17520 Newhope Street, Suite 200, Fountain Valley, CA 92708

Confirm: Call (714) 481-7236, or e-mail to: asceocewri@gmail.com

Share this event

bottom of page